What was the project challenge?
Paack, a leader in scheduled and sustainable delivery solutions, needed to optimize its logistics operations with
an efficient and scalable infrastructure. The project, developed in collaboration with Geek+, required a mezzanine solution that maximizes storage
space and accelerates parcel distribution in a high-demand environment.
an efficient and scalable infrastructure. The project, developed in collaboration with Geek+, required a mezzanine solution that maximizes storage
space and accelerates parcel distribution in a high-demand environment.
What solutions did we implement?
To address this challenge, we developed a 1,500 m² mezzanine specifically designed to support an AMR-based
parcel sorting system. The structure was engineered to withstand a live load of 300 kg/m², ensuring the strength and stability required
for operations.
The solution includes 10 workstations accessed via two walkways, featuring an improved ergonomic design
thanks to the workstation floor level being positioned below the mezzanine platform. Additionally, 200 custom-designed openings were created for efficient parcel unloading.
To ensure safety, the structure was designed with R60 fire resistance and finished with intumescent paint. he
mezzanine floor is made of fire-retardant panels, providing additional protection and durability.
What results and achievements did we deliver?
- Space optimization: A mezzanine structure tailored to the specific needs of the logistics center
- Demanding timelines: Project delivered within a tight schedule without disrupting operations.
- Coordination with subcontractors: Close collaboration with Moinsa and other teams ensure smooth
integration. - Improved logistics efficiency: The new structure enables Paack to manage operations with greater agility and
precision.